语言版本

About us

/
/
The company established Changzhou High Voltage Load Switch Engineering Technology Research Center

All categories

Company News

The company established Changzhou High Voltage Load Switch Engineering Technology Research Center

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2010-10-20 16:59
  • Views:

(Summary description)In October 2010, the company was approved by the Changzhou Science and Technology Bureau to establish the "Changzhou High Voltage Load Switch Engineering Technology Research Center". The total investment of the center is 7.2 million yuan. , The pilot test site is 2000 square meters. Purchase a batch of equipment and testing equipment. The "center" will be market-oriented and based on the national economic and social development plan to develop a series of high-voltage load switch products with independent intellectual property rights. Provide technology sources for the structural adjustment of the power industry and product upgrades, as well as for enterprises to introduce, digest and absorb foreign advanced technology, and improve

The company established Changzhou High Voltage Load Switch Engineering Technology Research Center

(Summary description)In October 2010, the company was approved by the Changzhou Science and Technology Bureau to establish the "Changzhou High Voltage Load Switch Engineering Technology Research Center". The total investment of the center is 7.2 million yuan. , The pilot test site is 2000 square meters. Purchase a batch of equipment and testing equipment. The "center" will be market-oriented and based on the national economic and social development plan to develop a series of high-voltage load switch products with independent intellectual property rights. Provide technology sources for the structural adjustment of the power industry and product upgrades, as well as for enterprises to introduce, digest and absorb foreign advanced technology, and improve

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2010-10-20 16:59
  • Views:
Information

In October 2010, the company was approved by Changzhou Science and Technology Bureau to establish the "Changzhou High Voltage Load Switch Engineering Technology Research Center". The total investment of the center is 7.2 million yuan. , The pilot test site is 2000 square meters. Purchase a batch of equipment and testing equipment. The "center" will be market-oriented and based on the national economic and social development plan to develop a series of high-voltage load switch products with independent intellectual property rights. Provide technical sources for the structural adjustment of the power industry and product upgrades, provide technical support for enterprises to introduce, digest and absorb foreign advanced technologies, improve product quality, and provide quality services for the development of the power industry in Changzhou. , The "center" is based on a high starting point and high level, and on the basis of the original relevant research conditions, it increases manpower and material resources and strives to build a first-class high-voltage load switch engineering technology center.

pic

Scan the QR code to read on your phone

Related Reading

There is currently no information to display
Please add data record on website background.

Feedback

Username used for comment:
客户留言
Description:
验证码

Home                About                Products                Intellectual                Party-masses                Technology                Contact

Address: Fumin Industrial Park, Menghe, Xinbei District, Changzhou City, Jiangsu Province

Jiangsu Dechun Power Electric Co., Ltd
code